ProModel and MedModel 2014

Kevin Field

Kevin Field – Sr. Product Manager

In regards to this release, I would like to start out by saying, in the words of Nacho Libre, “It’s pretty dang exciting, huh?

With ProModel and MedModel 2014 we’ve tried to keep our current customers in mind as well as new customers. For current customers, the new logic windows with Intellisense and Syntax Guide should help you build models faster and easier. And being able to import graphics from third party graphic programs like Photoshop, Gimp, Paint.Net, etc. should even be more useful now that you can rotate all graphic types in the application. The improvements to the Debug window are a direct result of our work on the new logic windows.

For our new customers, the redesigned Getting Started panel (formerly known as the Control Panel) brings a lot of model building resources to the forefront. We have added new demo models and refreshed several of our previous ones. Did anyone even know we had a Quickstart video, showing you how to build a simple model and analyze results in 10-15 minutes? The most exciting part might be the How To videos our Support team has been producing for several months now. All of our customers will find these extremely helpful.

In this blog I am going to casually comment on some of the new features with the assumption that you have already reviewed What’s New in 2014 and perhaps even viewed the webinar I gave on this release. If not, you might want to consider doing so, otherwise…you can blissfully continue on with me…

New Logic Windows

It’s amazing what a few simple colors can do to help your logic be more readable. As we were developing version 9.1, I found it more and more difficult to go back to 8.6 and “drag” myself through the dreary old plain black text 🙂 It’s funny how refreshing it was to get back to 9.1! Not only the color but also line numbers really make it easy to quickly get around in the logic.

1

 

 

 

 

 

 

 

And if you don’t like our default color scheme or want to have something a little easier on the eyes, simply customize the colors in the Logic Color Selection dialog.

2

 

 

 

 

 

 

We also want to encourage good formatting in the new Logic windows by utilizing white space (spaces, line breaks, etc.) and indentation. Don’t be afraid of it! By automatically indenting and out-denting after begin and end brackets, we hope to make co-workers everywhere more willing to leap in and review your logic with you! Auto-formatting is something we are looking to improve moving forward.

Another thing we have made steps to do is deprecate certain logic elements. Begin, End, and the # comment are the main ones. Don’t worry though, they are not completely gone! They won’t show up in the Intellisense list but they will still compile if used in logic. Begin and End are easier to read and enter in logic if you use the “squiggly” brackets { and } instead. And we want to use the # character for other things like the new #region statement.

In fact, #region is one of my favorite new additions to 2014. I love the ability it gives you to section your logic and collapse it with a label describing what’s inside that hidden portion of your logic. I hope you’ll find it quite useful.

Intellisense and Syntax Guide

These new features are probably the heroes of this release. Intellisense brings every statement, function, location, entity, variable, subroutine (I’m saying every model element!) right to your fingertips. You should almost never have to remember your element names or copy them from one place in logic to another, or even leave a module to go look it up. Besides that, the days of completely typing any logic or element name are gone. This should increase your productivity by at least 10-15% 🙂 Are you with me on this?!

3

Intellisense coupled with the Syntax Guide should nearly make the Logic Builder obsolete. There may be a few things we need to add in order to make that happen. Please feel free to share any suggestions you may have. We tried to make both unobtrusive to your logic creation and editing. Because of this, we didn’t add an option to hide Intellisense or the Syntax Guide.

4

 

 

 

Debug Window

MORE THAN 3 LINES!! I think that’s all I need to say on that.

Ok, I’ll also say that debugging should almost be a joyous endeavor as you are now able to anticipate what logic may get executed next and better understand where you came from.

Routing Probability

I’m going to refer you to the webinar I gave on this new feature. In it I give a great example (if I do say so myself) of how simple it is to set up a routing probability for scenario analysis. One thing to remember, in order to use an array in the routing Probability field, the array must be initialized through an import.

Getting Started Panel

The new panel that appears when you start the program may primarily be geared toward new users, however current customers may find it just as useful. Access to the How To videos, online Help, and additional training resources (like dates of future ProModel training classes and a link to ProModel University, our online self-paced training).

5

If you haven’t taken advantage of your M&S contract and utilized our Technical Support team then perhaps the Getting Started panel will help facilitate this. They are a tremendous resource to assist you in understanding different techniques for modeling aspects of your systems, troubleshooting your models and helping you get out of the paper bag you may have coded yourself into, or just a friendly person to talk to 🙂 We like to call them your “ProModel Friend”.

Speaking of the Support team, they have done a tremendous job of generating a lot of How To and Solution videos for quite some time now. The short videos range from 2-5 minutes and offer useful insight into modeling techniques and other useful software tips. Let us know if you have any suggestions for more videos!

New Graphic Libraries

A final word about our new graphic libraries. In order to create new libraries containing EMF (vector-based) files, which scale nicely when zoomed, we had to support the rotation, flipping, and sizing of these image types within ProModel. This makes it so you don’t have to generate an image for every possible rotation or flip you need to have for your animation. This reduces the size of the graphic library and thus your model footprint as well. So with this new capability, you should be using a third party graphics program like Photoshop or Gimp (which is free) to create your graphics. (Or perhaps get your coworker to do it, just don’t tell them that I suggested it.)

I can’t talk about the new graphic libraries without mentioning Laif Harwood, a member of our Support team. Laif gets credit for creating all the new graphics in the libraries. And a fine job he did! So if you want any tips on how to do it for yourself, give our Support team a call!

Well, that’s all I have steam for yammering about today. Remember…you have a ProModel Friend that’s just an email (support@promodel.com) or phone call away (888-PROMODEL).

 

Mitigating the Hawthorne Effect with Bruce Gladwin

Bruce Gladwin, PMP - Vice President, Consulting Services

Bruce Gladwin, PMP – Vice President, Consulting Services

With over 25 years of experience in the simulation field, Bruce has worked with major corporations worldwide developing hundreds of models across a wide range of industries. In his 19-year tenure with ProModel, he has served as a Product Manager, Senior Consultant, and Simulation Trainer. Bruce was named VP of Consulting Services in 2005 and has oversight responsibility for ProModel’s Consulting and Customer Service Operations.

Bruce received a BS in Systems Engineering from the University of Arizona and an MBA from Brigham Young University. He is a certified expert in Lean production principles and received his Six Sigma Black Belt certification while employed at General Electric’s Power Systems division.

Key projects include:

  • Capacity analysis for GE Energy Products Europe – determined the maximum production capacity for gas turbine components at GE’s European manufacturing facility resulting in a savings of $9.6M  in capital avoidance.
  • Design of a green-field manufacturing site for production of GE industrial generators – resulted in a savings of $1.2M in capital avoidance and identified the need for an accelerated operator training program.
  • Design and analysis of a disassembly process for the Russian-built SS25 Intercontinental Ballistic Missile (ICBM) in support of the 1991-92 START treaties between the US and the Soviet Union

Check out Bruce’s presentation on the Hawthorne Effect from the 2013 Winter Simulation Conference and his work with a major home improvement retailer…

To Expand or Not to Expand? Medical Clinic Simulation with Jennifer Cowden

JCowden Profile Pic

Jennifer Cowden – Sr. Consultant

Less is More

I once worked with a programmer whose motto was “Pay me by the line of code,” and, not surprisingly, his code was often lengthy, inefficient, and hard to follow.  I’ve always preferred the opposite approach;  it is an interesting challenge to try to get the same functionality into as few lines of code (or alternately, as few process records) as possible.  Also, employing reusable blocks of code cuts down on the opportunities for mistakes and overall debugging time.   When I was an applications engineer at an automation company, I often had to get assembly lines modeled in a very short turn around.

Luckily, ProModel’s macro and subroutine modules made implementing reusable code very simple.  For the medical clinic model demonstrated in this post, we took flexibility a step further by using the “ALL” option in the process edit table.  Even though this model was built to simulate eleven different clinic layouts individually, and contains over 500 patient locations, this model contains a total of only seven process records.  Adding new clinic layouts now takes a fraction of the time and can be done with minimal code adjustments.  If you have a repetitive process, or one that needs to be flexible to add workstations quickly, this methodology could save you modeling time as well.

Check out Jennifer’s work on the Medical Clinic simulation model:

 

About Jennifer

Before joining ProModel in 2013, Jennifer spent 15 years in the automation industry working for a custom turnkey integrator. As an Applications Engineer she built simulation models (primarily using ProModel) to demonstrate throughput capacity of proposed equipment solutions for a variety of customers. Jennifer’s experience covers a wide range of industrial solutions – from power-and-free conveyor systems to overhead gantries and robotic storage and retrieval systems. She has also created applications in the pharmaceutical, medical device, automotive, and consumer appliance industries.

Jennifer has a BS in Mechanical Engineering and a Master of Science in Mechanical Engineering from the Georgia Institute of Technology.

ProModel on The Lean Nation

ProModel’s Bruce Gladwin (V.P., Consulting) and Dave Tucker (Director, LSS Initiatives) join web and radio host Karl Wadensten on “The Lean Nation” to discuss the benefits of ProModel Simulation in lean initiatives.  Enjoy!

Probing LEAN Space with Dave Tucker

Dave Tucker

Dave Tucker – Director, LSS Initiatives
Lean Six Sigma Master Black Belt

Most companies have the same basic question they are trying to answer from a model project.  How can I make more stuff quicker?  Whether it is manufacturing, government, healthcare, or most any other industry, they all want to get more items through their processes faster and often they want to do it with fewer resources.  That’s the climate we are in now.  Everyone has to do more with less.

I have observed that many problems in Manufacturing can be directly attributed to having too much WIP.  Excess WIP inventory ties up money, creates the need for storage, increases cycle time, reduces throughput, and wastes Resources time.  But Managers want to keep everyone busy so they allow more work to be introduced into their systems instead of looking for Lean ways to better manage the “pull” of work.  Companies that learn to control the amount of WIP to meet their orders always do better financially then other companies that continually flood the workplace with inventory.

So I get excited when a model shows some new information that a company has never seen or understood before.  When they can see the process waste, understand how to remove it and implement the plan – that’s a great thing.

Check out Dave’s work on the Space Shuttle Program with United Space Alliance and NASA…. 

ABOUT DAVE

Dave Tucker is ProModel’s Director of Lean Six Sigma (LSS) Initiatives and also serves as a Senior Management Consultant and Project Manager.  He assists our clients primarily by providing simulation training, model consulting services, and LSS implementation advice.  Prior to joining ProModel, Dave was the Lead Lean Six Sigma (L6S) Master Black Belt at United Space Alliance (USA), located at the Kennedy Space Center in Florida.  USA is the prime contractor to NASA responsible for the Space Shuttle Program.

Dave has over 25 years’ experience leading teams, mentoring employees, solving problems, conducting training, and improving operations. He has led more than forty Kaizen Events, completed dozens of process simulation modeling projects, conducted hundreds of training sessions, facilitated over two hundred Belts & Team Leaders, and assisted with the implementation of numerous process improvements saving millions of dollars.

Dave has an extensive background in numerous process improvement tools utilized in Lean Six Sigma DMAIC & DMEDI approaches, as well as Kaizen team methods and process simulation modeling.  He has about 14 years’ experience using ProModel process simulation modeling tools for process improvement.  In addition, he is a sought after speaker and has made many well-received presentations at Process Improvement, Simulation, Industrial Engineering, and Aerospace Conferences.  He has a BSBA in Management from the University of Central Florida.  Dave is a Certified Lean Six Sigma Black Belt and a Certified Master Black Belt.

Team ProModel Ragnar Relay: The Experience

RPS_Business_Portrait

Pat Sullivan – VP, Army Programs

“12 friends, 2 vans, 2 days, 1 night, 200 mile relay…unforgettable stories.”  Ragnar

ProModel continues to demonstrate a commitment to building teams.  Over the past several days (25-27 Oct), Team ProModel grew as friends and athletes in one of America’s most grueling endurance races. The Chattanooga to Nashville Ragnar Relay undoubtedly demanded an often extraordinary level of dedication and sacrifice.  That dedication was played out during the race, but initiated and nurtured during the miles of running our team did in the months leading to the race…well, I must stop here to introduce the entire team, as some members considered their training was                                         an unnecessary crutch.

Team ProModel preparing to leave Huntsville

Team ProModel preparing to leave Huntsville

Ragnar-lockup-blue-backgroundThe twelve person team consisted of team captain Tim Shelton, (ProModel Sr Army Program Manager), Pat Sullivan (ProModel VP for Army Programs),  Brian Brown, Susan Whitehead, Jennifer Harbaugh, Ryan Harbaugh, Robert Brown, Sheri Shamwell, Barry Crocker, Cori Wilkerson, Wes Wilkerson, and Eric DeBolt (the ringer).  And the team could not have run one step had it not been for the commitment of Keith Vadas and Carl Napoletano…and the incredible effort of Christine Bunker (ProModel marketing) and our awesome drivers and support crew (Jim Craft and Kelly Parker).

So, back to the memories… our race day started when we met at our link up point in Huntsville and received our great running gear before loading up our well apportioned vans…the ones we called home for the next several days.  Thanks to our sponsors we had everything one would need…except maybe for a personal masseuse and about three more weeks of training.

Eric “The Lightning” Debolt takes off from the first major exchange point

Eric “The Lightning” Debolt takes off from the first major exchange point

Once on the starting line, in great ProModel fashion, our #1 runner (Robert Brown- a late arrival to the team) voiced the first of what would be many quotable moments. After the race director, announced that “this start represented the culmination of all the months of hard work and training in preparation for Ragnar,” Robert, turned to the team and said “hey, you didn’t say anything about months of training!”

And then the gun went off…at a beautiful waterfront setting on the Tennessee River in Chattanooga, the team was off on our journey.  The plan was set and optimized.  Each runner was scheduled for three legs during the estimated 34 hours to complete the race.  We planned for each of our 12 runners to complete 16-19 miles each. And we delivered…the team completed the Ragnar in under 31 hours!

Jennifer Harbaugh pushes through her last leg through the beautiful horse farms just out side Nashville

Jennifer Harbaugh pushes through her last leg through the beautiful horse farms just out side Nashville

As the sun dropped, the miles faded and the temperature plunged.  Now, some of you may think that running in 25 degrees in the middle of the night is not that cold.  But for a bunch from the south, it was painful.  Couple that with little to no sleep over two days…and the mettle testing of endurance racing was on!

Rob Brown runs in the early morning light as the sun rises and the frost covers the ground. Temperatures dropped 30 degrees overnight

Maybe 25*?

After a cold night, with most pushing through on less than 2 hours sleep, each leg became more punishing… and as the sun rose, Team ProModel made it through the mountains, and into the rolling hills of Tennessee.  With the frost on the ground, the beautiful country side made for a memorable sight as the team passed the 100 mile mark.

Here are a few quotes and observations from the team:

Tim Shelton & Ryan Harbaugh exchange early morning

Tim Shelton & Ryan Harbaugh exchange early morning

“We are two legs up…”  Tim Shelton called in after conferring with the Race Director on our current progress.

“I’m JUST a stay at home Mom…”  An attractive young lady shared with Wes just before their leg.  Once the hand off occurred, she dropped him like a bad habit on her way to averaging 7:15 minute miles.

Eric “the lighting” DeBolt…delivered as promised by turning continual 6:00 minute miles…and then got up early on Sunday to run an “easy” 15 miles at 7:00 minute mile pace.

Jim Craft van driver/team manager/time keeper/ sleepless companion…was often heard mumbling through the night, “this is like herding cats.” 

Pat Sullivan runs through downtown Nashville towards finish line

Pat Sullivan runs through downtown Nashville towards finish line

Pat Sullivan often lost focus…”squirrel!”  What was I saying?

“Just one mile of suck left…”  a common quote Wes shared at each “one-mile to go” marker. 

“Where’s the van…Where’s that “one-mile-to-go-marker.”  Almost everyone racing… J

“Time to get up” says Jim to Barry…”but I never went to sleep.” Replies Barry.

“You are not my favorite person…” Rob says to one of his teammates while seven people tried to get some sleep in a van.

I wrote this somewhat generically…it’s hard to fit in all the stories and express the depth of our appreciation for having the opportunity to represent ProModel.  Thanks again for the great support and allowing us to represent ProModel…know you would have been proud.

Cori Wilkerson runs through the Tennessee hill country

Cori Wilkerson runs through the Tennessee hill country

Brian Brown running towards his first exchange point

Robert Brown “hey, you didn’t say anything about months of training?!”

Susan Whitehead pushes up hill as Team ProModel makes its way through the Tennessee mountains!

Susan Whitehead pushes up hill as Team ProModel makes its way through the Tennessee mountains!

ProModel Welcomes Col (Ret) Pat Sullivan

RPS_Business_Portrait

Pat Sullivan – VP of Army Programs

Over the past 28 years, I have served our Nation as a member of the Armed Forces with great pride.  I enjoyed being a Soldier, and continually sought ways to grow as a Soldier and leader.  And now, I am honored to join the great team at ProModel!  I can think of no better professional fit for my background. I am convinced ProModel understands the challenges Army planners and logisticians face…and have an exceptional product and capable team at the ready to solve the toughest problem sets.

As a career logistician, I always sensed we could do just a little bit better with regard to how we supported customers and cared for the entrusted resources available.  The issue was often what we referred to as “brute-force” logistics.  We continually employed additive techniques to support a system that often prevented us from fully visualizing our process and anticipating the impacts of certain change.

Whether establishing logistics hubs during major exercises in Thailand or building based camps in Iraq during Operations Desert Storm and Iraqi Freedom, I intuitively knew we could apply a more scientific approach.  We understood the tenants of supply chain management and even specified “anticipation” as a logistics imperative.  However, when I served as a National Guard Battle Command Training Program logistics trainer, I always struggled with how to answer the inevitable question of how do we know our log process works and how can we test the impacts of the anticipated change.  You see, we had developed a process for what to anticipate, but we had next to nothing to do figure out what the resulting change would mean to readiness.

I can provide countless examples of planning efforts that involved spreadsheets, Post-It notes, and Power Point charts that proved insufficient in supporting the execution.  The fog of war was only cleared through the extreme efforts of Soldier logisticians who facilitated our processes and closed the gaps of the unknown. It became second nature to augment our supply chain with additional resources to enhance efficiency. The Army is good at it…

However, as we move forward the technique may out run available resources. In other words, we won’t likely have Soldiers to support such facilitation.  Therefore, we have gone back to the drawing board to get smarter.  Over the past several years, we learned that if we have a model to track the flow of our supply chain, we can simulate the process and enhance effectiveness and efficiency.  The Responsible Retrograde from Operation Iraqi Freedom in Iraq and the on-going efforts in retrograding supplies and equipment from Afghanistan are examples.  While the Army supply chain isn’t fully optimized…the visibility, tracking and understanding of the “why” behind condition changes is much more refined.

The next natural step was to leverage modeling and simulation, coupled with some big data analytic techniques, to vertically integrate the most complex tasks we perform.   In my role as Commander, US Army Materiel Command Logistics Support Activity (LOGSA), it was optimizing equipment supply against validated requirements.  This was no small feat…

The Army did have a jumpstart on the demand as US Forces Command, in conjunction with ProModel, developed the ARFORGEN Synchronization tool to tell us what units were deploying and when.  The next step was to extract a 1 to N demand signal by unique type of equipment.  That’s when the work really started.   When we applied available supply to prioritized demands and visualized over time the transactional volume was seemingly overwhelming…that is when you look at it in aggregate. When we looked at it in terms of execution, we found the efficiency gained would provide immediate value as it related to Army readiness…And that we could reduce the # of planners by nearly 100.

Don’t get me wrong, this is not to say the Army has been totally deficient in using modeling and simulation in support of our supply chain.  Rather, the beauty of this effort was to move from traditional methodology and look at the problem through a new lens.  We expanded the aperture…created a new playing field and entered the world of 21st Century supply chain management best business practices.

So, at the corporate level, the Army has developed capability that has value as it relates to facilitating unit readiness.  Some value exists at the tactical level, but at the lowest levels, executors don’t have the tools to exploit the real power of modeling and simulation.

That’s why I like ProModel.  Sorry for the cliché, but if we consider the possibilities…if we put usable tools…advanced, tailor-able, flexible modeling and simulation capabilities in the hands of those who must make decisions rapidly, then we are clearing their schedule for other more critical tasks.  Whether a forward support battalion planner, Lean Six Sigma Black belt or Department of the Army resource analyst, immediately accessible and easily usable modeling and simulation capacity will ensure we make better decisions.  Collectively, we need to spend more time analyzing answers and visualizing the opportunities, and less time compiling data into Power Point charts that rarely answer “what happened” much less “why it happened.”  I’m convinced ProModel can help Defense customers understand the possibilities in enhancing readiness and inject greater efficiency into our decision cycle.

ProModel Services

Improving enterprise performance with a ProModel Solution is a multifaceted experience.  Whether you’re using our award winning simulation products on your own or working with some of our talented professionals in consulting, technical support, and training, ProModel’s goal is to help you make better decisions faster!  Take a look at this video to get a better idea of what ProModel Services mean to our customers.

For more information please visit our service page:

http://www.promodel.com/services/